Recycled Asphalt Millings Bunnell FL Duval Paving, LLC
Let me start by saying I have had the run around before and because of that I did my research and Im sure glad I did John and James at duval paving James have me a bid on laying substrate a layer of 4 inches of millings then a final 2 inch layer of hot asphalt the owner John was on the job site the entire time project took 34 days that was 6