SPECIFIC GRAVITY AND ABSORPTION OF FINE AGGREGATES AASHTO
Fill cone to overflowing with drying sand. Lightly tamp the fine aggregate into the mold with 25 light drops of the tamper (Figure 3). Each drop should start about 1/5 in. above the top surface of the fine aggregate. Remove loose sand from base and carefully lift the mold vertically.